Customization: | Available |
---|---|
Type: | Gravity Separator |
Voltage: | 380V |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Data Sheet: DMT-100SD Gold Shaker Wash Plant | |
General Specifications: | |
Model | DMT-100SD |
Capacity | 150-200 tons per hour (depending on material type and conditions) |
Power Requirement | 60-100 kW (depending on configuration) |
Water Requirement | 400 cubic meter hour (m³/h) |
Dimensions (L x W x H) | 8900*2300*5700 mm (approx.) |
Weight | 12000~16000 kg (depending on configuration) |
Material | High-grade steel (wear-resistant and durable) |
Trommel Specifications: | |
Screening Area | 7.5 m² (1.5m*5m) |
Feed hopper size | 3.4*2.4m (Suit for load in container) |
Screen Mesh Size | Customizable (e.g., 10mm, 20mm, or 30mm) |
Deck Drive Type | Vibrating motor 11kw |
Screen material | High manganese steel |
Eletric Control Cabinet | 11 KW soft start box |
Sluice Box Specifications: | |
Length | 6-12 meters |
Width | 1.0 meters or 2.0 meters |
Riffle Design | Hungarian riffles or expanded metal riffles |
Matting | Rubber matting or miner's moss or dream mat for gold trapping |
Adjustability | Sluice angle can be adjusted for optimal recovery |
Water System: | |
Water Pump | 8 inch centrifugal pump or submersible pump |
Flow Rate | 400 m³/h-600 m³/h |
Water Recycling | Optional water recycling system available |
Hose Diameter | 6-8 inches |
Hose Type | PVC Lay-flat or rubber hose |
Power Options: | |
Electric Motor | Vibrating motor 11kw + Water pump 55kw (standard) |
Diesel Engine | Optional for remote locations |
Generator | Available as an add-on for off-grid operations |
Optional Add-Ons: | |
Centrifugal Concentrator | Enhances fine gold recovery. |
Shaking Table | For final concentration of gold. |
Conveyor Belt | For easier material handling. |
Water Recycling System | Reduces water consumption. |
Gold Recovery Rate | 60-95% (depending on material and setup) |
Performance: | |
Material Handling | Suitable for clay-rich, gravel, or sandy soils |
Operating Conditions | Can operate in wet or dry environments (with modifications) |
Mobility | Mounted on a trailer or skids for easy transport |
Transportation: | |
Setup Time | 48~72 hours (depending on site conditions) |
Dismantling Time | 24~48 hours |
Environmental Features: | |
Water Recycling | Reduces water usage and environmental impact |
Low Noise | Designed for minimal noise pollution |
Eco-Friendly | Minimal chemical use (if any) |
Maintenance: | |
Lubrication Points | Easy-access grease points for bearings and moving parts |
Wear Parts | Replaceable screens, spray bars, and riffles |
Service Interval | Every 200-300 operating hours |
Applications: | |
Large-scale prospecting/River and stream mining/Alluvial gold recovery/Placer gold mining | |
Manufacturer Support: | |
Warranty | 1-year limited warranty |
Technical Support | Available for setup, operation, and troubleshooting |
Spare Parts | Readily available for quick replacements |