Customization: | Available |
---|---|
Type: | Gravity Separator |
Voltage: | 380V |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical Data Sheet:DMT-100 Pro gold trommel wash plant | |
General Specifications: | |
Model | DMT-100 Pro |
Capacity | 100 tons per hour (depending on material type and conditions) |
Power Requirement | 60-100 kW (depending on configuration) |
Water Requirement | 200 cubic meter hour(m³/h) |
Dimensions (L x W x H) | 11800*2300*3500 mm (approx.) |
Weight | 17,000-22,000 kg (depending on configuration) |
Material | High-grade steel (wear-resistant and durable) |
Trommel Specifications: | |
Trommel Diameter | 1.5 meters |
Trommel Length | 8.5 meter |
Screen Mesh Size | Customizable (e.g., 10mm, 20mm, or 30mm) |
Rotation Speed | 8-12 RPM (adjustable) |
Spray Bars | 6-8 bars with high-pressure nozzles for efficient washing |
Drive System | Electric motor |
Sluice Box Specifications: | |
Length | 6-12 meters |
Width | 1.0 meters or 2.0 meters |
Riffle Design | Hungarian riffles or expanded metal riffles |
Matting | Rubber matting or miner's moss or dream mat for gold trapping |
Adjustability | Sluice angle can be adjusted for optimal recovery |
Water System: | |
Water Pump | 6-8 inch centrifugal pump or submersible pump |
Flow Rate | 200 m³/h-350 m³/h |
Water Recycling | Optional water recycling system available |
Hose Diameter | 6-8 inches |
Hose Type | PVC Lay-flat or rubber hose |
Power Options: | |
Electric Motor | Trommel 30kw + Water pump 37kw (standard) |
Diesel Engine | Optional for remote locations |
Generator | Available as an add-on for off-grid operations |
Optional Add-Ons: | |
Centrifugal Concentrator | Enhances fine gold recovery. |
Shaking Table | For final concentration of gold. |
Conveyor Belt | For easier material handling. |
Water Recycling System | Reduces water consumption. |
Gold Recovery Rate | 60-95% (depending on material and setup) |
Performance | |
Material Handling | Suitable for clay-rich, gravel, or sandy soils |
Operating Conditions | Can operate in wet or dry environments (with modifications) |
Mobility | Mounted on a trailer or skids for easy transport |
Transportation: | |
Setup Time | 6-8 hours (depending on site conditions) |
Dismantling Time | 4-6 hours |
Environmental Features: | |
Water Recycling | Reduces water usage and environmental impact |
Low Noise | Designed for minimal noise pollution |
Eco-Friendly | Minimal chemical use (if any) |
Maintenance: | |
Lubrication Points | Easy-access grease points for bearings and moving parts |
Wear Parts | Replaceable trommel screens, spray bars, and riffles |
Service Interval | Every 200-300 operating hours |
Applications: | Placer gold mining |
Alluvial gold recovery | |
River and stream mining | |
Large-scale prospecting | |
Manufacturer Support: | |
Warranty | 1-year limited warranty |
Technical Support | Available for setup, operation, and troubleshooting |
Spare Parts | Readily available for quick replacements |