
Technical Data Sheet: DMT-5 Vibrating Gold Wash Plant |
General Specifications: |
Model |
DMT-5 |
Capacity |
5 tons per hour (depending on material type and conditions) |
Power Requirement |
3-5 kw (depending on configuration) |
Water Requirement |
15-25 cubic meter hour (m³/h) |
Dimensions (L x W x H) |
2.0*1.2*1.5m |
Weight |
470 kg (depending on configuration) |
Material |
High-grade steel (wear-resistant and durable) |
Vibrating Screen Specifications: |
Screen Size |
0.8 m x 2m (approx.) |
Screen Mesh Size |
Customizable (e.g., 10mm, 20mm, or 30mm) |
Vibration Frequency |
Adjustable for optimal material handling |
Spray Bars |
4-6 bars with high-pressure for efficient washing |
Drive System |
Electric motor |
Sluice Box Specifications: |
Length |
2 meters |
Riffle Design |
Hungarian riffles or expanded metal riffles |
Matting |
Rubber matting or miner's moss or dream mat for gold trapping |
Adjust-ability |
Sluice angle can be adjusted for optimal recovery |
Delivery time |
7-30 days (depends on order,normally have in stock) |
Container loading capacity |
6 units/20GP, 24 units/40HQ |


Q: Are you a factory ?
Reply: Yes, we are factory, 3200 square meter workshop and office.
Q: What is gold recovery rate of your equipment ?
Reply: All gravity recovery methods are highly dependent on particle size and shape. Besides operational variables, such as feed presentation (screen aperture, feed rate, solids/water ratio) and sluicebox design (i.e. length, width, slope, riffle pattern), the gold particle size distribution and shape are inherent factors determining the gold recovery rate. anyone say that equipment recovery is 80%, 90% something is not true. it's all depends. but 90% of placer mining gold wash plant will use sluice boxes rather than jig, concentrator, etc.
Q: Gold trommel vs Gold shaker deck ?
Reply: While the capital equipment cost for trommel and shaker decks of equal diameter/width is similar,trommel screen plants come with the advantage of longer maintenance intervals and slightly lower operating costs for maintenance. The shaker deck design handles higher tonnage throughput and providesthe opportunity for running a primary sluice run in the screen under pan. Downunder4gold offers both trommel and shaker deck wash plants that can be configured to most ground conditions.
Q: What is difference of Downunder4gold equipment ?
Reply: we consider more than others how to ensure our plant will work well on mine site. we spend years on designing new model, we combine all the good thing others mining experience. we are compete with suppliers from Canada, USA, South Africa. Downunder4gold supply ratio from 5 tons per hour upto 500 tons per hour. we have hydraulic riffle sluice box, miner moss, rubber mat. gold trommel, gold scrubber trommel, shaker screen (deck). that can be configured to most ground conditions.
Q: What is delivery time ?
Reply: Most of our model will be in stock, after recieve deposit 10-15 days. if no stock, take 3-4 weeks for production.
Q: Are you supply accessories used on gold wash plant ?
Reply: Yes, we supply all accessories and tools, such as water pump, layflat hose, diesel generator, even we can out sourcing trucks, Wheel loader, Bulldozer, Excavator. we will put orders together in our factory, and we can book the shipment for our client.
Q: Do you supply installation service ?
Reply: Yes, Downunder4gold will give the installation guide to our client. most of our wash plant model are modular, easy and fast installation. remote installation will help in most case.